News from the UK Solar Provider
UK Solar Provider Completes Its First 95 kWp Project Near Royston
UK Solar Provider Ltd is delighted to announce it has completed a 95 kWp system in south Cambridgeshire at Vine farm last week.
Our first major project here in the UK got off to a slightly rocky start in that planning permission delayed the start of the project by two months. Going into full planning became a necessity in order to allow the tilting of the panels on the east/west facing roof so that it faces the south (in order to capture maximum sunlight for the system to be as efficient as possible).
With components of the highest quality from Aleo (a company owned by Bosch) and SMA, the system is mounted on 3 grain stores with the installation comprising of 416 Aleo 230W panels, 4 SMA 15000 inverters and 2 SMA 17000 TL inverters.
The system itself will generate clean and green energy, of which 40% will be exported to the grid and 60% will be used on site for grain drying, saving the owners of the farm much money through reduced energy bills and income from the feed-in-tariff.
With an impressive performance ratio of 80.7%, the system will produce around 91,532 kWh per year, saving 81 tonnes of CO2 emission. The SMA webbox will monitor the performance and reliability of the system 24/7, ensuring maximum functionality at all times.
CLA Game Fair 22nd-24th July 2011
UK Solar Provider will be attending The CLA Game Fair
UK Solar Provider is pleased to announce we will be exhibiting at The CLA Game Fair from 22-24 July in the renewable energies section.
The CLA Game Fair attracts an assortment of people with its prestigious platform for country sports and activities, providing great insight into the present and future outlook of the countryside here in the UK
You can check out exactly what The CLA Game Fair has to offer over at their website: http://www.gamefair.co.uk/
Follow us on twitter, facebook & more
Keep up with the latest news from UKSP by connecting with us on twitter, facebook and linked-in.
Stay informed about up-to-date offers, projects, breaking news and other interesting announcements in the solar industry.
Become a Fan of UKSP on Facebook and see what we have developed so far and what we are building at the moment. This will give you an easy way to keep tabs on us and share the knowledge with your friends. Thanks for joining us, and spreading the word for a greener United Kingdom.
The link to our Twitter channel is http://www.twitter.com/UKSolarProvider
95 kWp Solar Energy System in South Cambridgeshire/Royston
UK Solar Provider Ltd is happy to announce that we have submitted full planning for a 95 kWp rooftop solar system. This is our first system in the UK and will be developed on an agricultural farm in South Cambridgeshire near Royston.
The system will be mounted on 3 grain stores in total, 1 barn facing south, the other 2 facing east/west. On the roofs of the east/west facing barns the panels will be mounted on a-frames so they are south facing. UK Solar Provider will use components of the highest quality available: solar panels from Aleo and inverters from SMA.
The installation includes 416 Aleo 230W S19 panels, the award winners of the stiftung warentest, 4 SMA 15000 TL and 2 SMA 17000 TL inverters.
In the summer most of the carbon free energy generated will used on site for grain drying, providing the owners of the farm not only with an additional income through the feed-in-tariff, but also saving them money by reducing their energy bill. The generated energy will be 91,532 kWh per year of which about 40% will be exported to the grid and 60% will be used on site. Per year 81 tonnes of CO2 emission will be avoided.
The whole system has a superb performance ratio of 80,7%. The performance and functionality of the system will be monitored 24/7 through a SMA webbox.
The construction will start on the 2nd of May 2011 and will be completed and connected to the grid on the 19th of May.